 SEQENCE OF BASIC JOB STEPS HAZARDS CONTROLS/RECOMMENDED

 基本的工作步骤 隐患 SAFE WORK PROCEDURE

 控制方法

 Page 1 of 9

 工作计划准备

 Plan preparation

 

 1 施工计划不详细、 不周全造成施工混乱 ,易造成伤人,如交叉作业。

 Injury easily caused by incompletes plan such as inters electing work.

 2、施工许可 PTW 未办理, JHA、 STA 会议交底不清,警告、标志不明,工人不知道、不熟悉安全要求,违章作业造成伤害。

 Injury caused without JHA or

 blurred STA Meeting or inexplicit

 warning sing or workers not familiar with safety requirement.

 

 1.施工员每日工作前,必须有当日的详细工作计划与安排,并与安全部门沟通。

 The technician must communicate with safety department for the daily work piano before day working

 2.施工前 JHA 、PTW、警告标志必须张贴在明显处,施工员要招开 STA 会议,对工人详细讲解当天的工作程序和安全要求。

 JHA, PTW, Warning sings should be put up obviously. The technician should tell the workers the day work procedure and safety requirement by holding STA meeting.

 3.工人不熟悉 IIP 现场规章制度安

 全要求。

 The workers are not familiar with

 IIP field safety rules

 4.PPE佩戴不正确。

 Not wearing PPE properly

 

 3.有员工进入 IIP 现场必须经过 IIP HSE 部门培训,方可上岗作业。

 All the workers entering the IIP site should be trained by IIP HSE.

 4.人根据岗位特点及 JHA 、 PTW、 STA 要求正确佩戴 PPE。

 Workers wear right PPE according to the kind of work and JHA, PTW, STA requirement.

 Page 2 of 9

 材料运输

 Material Transportation

 

 1.交通事故 1、运输材料采用人力车、汽车运输,材料必须

 Traffic accident 捆绑牢固。

 2.输中材料捆绑不牢伤人 Material can be delivered by the map powered car

 The material not tied tightly during can the material should be tied tightly.

 transportation 2、用正确的搬运方法,超过 100 公斤以上重物

 3.搬运方法不当伤腰、 伤手伤脚。 用吊车吊运卸车。

 Incorrect methods cause injury when Using the right carrying methods. Heavy loads

 unloading

 above 100kg can be unloaded by crane.

 4.吊车吊运伤人。

 3、采用人工传运时,工人必须相互呼应招呼,

 Injury caused by the crane lifting

 待另外一人把握牢固时方可松手。

 5.滑轮固定不牢伤人

 The workers must communicate with each other

 The pulley not fixing tightly

 ’

 when delivering with hand .One couldn t relax until

 the other one is ready.

 4、滑轮必须与构筑物捆绑牢固方可使用。

 Pulley must be tied tightly with the constructions

 before being used.

 5、超过 10M 以上高度,材料采用吊车吊运,绳

 子、滑轮辅助吊运。

 The material shall be delivered with crane and

 assist anted by ropes

 6、车辆行使按 IIP 现场行使路线行使, 限速 1 公

 里/小时。Vehicles should be driven according to

 IIP requirement the maxim speed within 10KM

 per hour.

 7、施工人员必须从梯子上下。

  The workers must

 go up and down from ladders.

 Page 3 of 9

 1、无证操作造成触电

 1、电工必须持证上岗,非电工严禁从事电工作

 Electrical injury

 by

 operating

 业。设警告标识 electrical operator should work

 without license.

 with license, non-electrical operator couldn ’tdo

 2、电工接电时与他人合闸造成触

 electrical work. Setting warning signs.

 电。

 2、操作时设警告标识,戴绝缘手套,一人看护

 Electrical injury by switching on

 一人 操作 。

 Setting warning signs, wearing

 with others when electrical work.

 insulated gloves, one operates the other one

 3、选择劳保用品不合适造成失火

 standing by during operating.

 触电。

 3、电工必须正确佩戴 PPE,选择电工专用工具。

 Electrical injury by unsuitable PPE

 Electrical operator must wear proper PPE ,

 and tools

 choose the special tools.

 4、选择的用电材料不合格不合适

 4、配电箱、电缆必须有合格证,必须符合国家

 施工用电

 造成失火触电。

 用电规范。Distribution box and cable and cable

 Construction Electricity

 Electrical injury

 by

 unqualified

 must be

 qualified

 and fit for

 the rules of

 electrical material

 temporary electricity in our country

 5、工用电安装不规范造成失火触

 5、施工用电,配电箱、电缆必须经过

 IIP、HSE

 电。

 检查合格方能使用。配电箱必须设接地,离地不

 Construction electricity fixing not fit

 得低于 50CM。严格按照三级配电二级漏电保护。

 for the requirement cause fire and

 电缆离地大于

 2.5M 。

  construction

 electrical injury

 electricity ,distribution

 box and cable should be

 6、电缆与建筑物钢性物质接

 used after acceptance by IIP HSE. Distribution box

 触造成触电失火。

 must join to the ground with the distance no less

 Cable touching

 with

 the steel

 than 50CM, strictly according to 3 rd distribution no

 material of constructure

 cause

 less than 2nd

 leakage protection .cable is 2.5CM

 7、电缆接头不规范造成触电

 high from the ground.

 失火。

 6、缆用绝缘瓷瓶或木方,与钢性物质隔离。

  The

 Joint of cable

 done

 unqualified

 cable should be insulated with steel material by

 Page 4 of 9

 cause insulated stoneware or wood.

 8、用电量过载造成失火。 7、电缆接头必须用防水插头或用绝缘防水胶布

 包裹严密。

 The cable joint must be tied tightly

 Over loading of the quantity of

 electricity using cause fire

 

 with waterproof switch or insulated adhesive plaster.

 8、符合临时用电设计要求,用电量大于 50KW 或 5 台以上用电设备,必须有施工用电组织设计。

 Fit for the requirement of temporary electricity . if the quantity of electricity use is more than 50KM,or the quantity of electricity equip. is more than 5, there will be design for construction electricity.

 Page 5 of 9

 1、不合格的吊车吊具造成人员受

 1、所有的吊车、砼泵车吊装索具、钢丝绳必须

 伤、机械损坏

 经 IIP HSE 检查合格后方可使用

 all

 the

 unqualified

 crane rigging cause

 riggings, ropes of the vehicles must be accepted

 injury and machinery getting bad

 by IIP HSE.

 2、不合格的司机、指挥人员造成

 2、吊车司机、起重工必须持证上岗,并经过

 IIP

 人员受伤、机械损坏

 HSE 部门培训方可上岗。

 All the operator with

 unqualified

 driver and conductor

 licenses starts to work after being trained by IIP

 cause injury

 and machinery getting

 HSE .

 bad

 3、吊装作业区域设警戒线、警告表示,派专人

 3、对无关人员的伤害

 监护,无关人员严禁入内。吊车旋转半径、

 injury to others

 吊臂下严禁站人 setting cordon and warning

 4、吊车倾倒造成人员受伤、机械

 signs in the lifting area. No permit no entering.

 损坏

 No standing person under the crane vehicles.

 吊装作业

 the crane raved over cause injury

 4、吊装前首先检查地基牢固、吊装支腿下设垫

 Lifting work

 and machinery getting bad

 木、垫板,吊装设备要每日检查,每日填写

 5、吊物伤人,破坏机械设备

 检查表,吊车的重量符合吊车的起重重量。

 lifting injury, mechanic equipment

 Check the ground foundation firmly

 , the slab

 turning wrong

 under the crane leg

 .crane equipment must

 6、沟通不够伤人

 checked everyday . and writing check table

 not enough communication lead to

 everyday. The weight of crane must fit for the

 injury

 vehicles lifting weight.

 7、交通事故

 5、吊装时吊物要设溜绳

 setting tag line when

 traffic accident

 doing lifting work.

 8、吊物捆绑不牢伤人

 6、起重工必须指挥信号清楚,司机的视线清晰

 injury by uptight lifting object

 the operator should give clear signals and the

 9、索具损坏断裂伤人

 driver should see forward clearly.

 injury by bad rigging

 7、吊车按照施工现场行使路线行使,车辆限速

 Page 6 of 9

 10 公 里 / 小 时 vehicles should be driven

 according to IIP requirement, the maxim speed

 within 10KM per hour.

 8、吊运前要检查吊物捆绑是否牢固 check the

 material whether it is tide tightly before lifting.

 9、吊运前要检查索具、吊绳是否符合 IIP 标准,

 check the riggings and slings whether they are

 fit for the standard of IIP ,using after having

 tag. Change them if turning bad.

 Page 7 of 9

 Page 8 of 9

 1、合适的劳保用品造成人员伤害

 1、作业人员必须经 IIP HSE 培训持证上岗,超

 injury by unfit PPE

 过 1.8 米配戴安全带,安全带要捆绑在牢固物

 2、焊光容易灼伤人的眼、脸

 体构件上,安全带高挂低用。

 All the operators

 eye and face injury easily caused

 with license should be trained by IIP HSE ,

 3、氧气、乙炔泄露引起失火、爆

 safety belt shall be hung on the firm member at

 炸

 high place if the work height is more than 1.8m

 fire and explosion caused by leakage 2、作业时必须申请办理

 PTW 热工作许可证,设

 电焊、气焊作业

 of oxygen &ethane.

 置灭火器,派专人看火,看火人员严禁脱岗。

 、焊条及焊条头未回收造成对土

 配戴正确的 PPE 面罩,设弧光挡板。

 Obtain

 welding work

 4

 PTW & hot work permit prior to commence

 壤污染

 soil pollution by not recycling the

 to work, extinguisher should be set at work

 welding rod.

 area, full-time

 watchman should

 be at

 site

 5、焊机漏电造成触电

 during working

 . wearing right

 PPE ,

 face

 electricity machinery

 shield ,setting arc shield.

 6、电弧焊造成灼伤,应设置挡板

 3、氧气、乙炔运输时必须捆绑牢固分别运输,

 arc injury, set arc screen

 吊运时用吊笼,氧气、乙炔应分类放置,放

 置必须牢固,放置距离必须大于

 8 米。Oxygen

 & ethane cylinder

 should

 be

 transferred

 separately and tied,

 lifting cage shall be used

 when lifting , the distance between two kind of

 gas should be more than 8m and should be put

 on the firm pad.

 4、氧气、乙炔设回火装置,每天使用前检查

 炔、氧气瓶胶带、阀门、压力表是否有泄露

 现象,安全阀、压力表安全指数是否正常,

 焊枪是否堵塞,都必须经检查合格正常后方

 可使用。

 Retro-fire system shall set at oxygen

 Ethane, check leakage of adhesive ribbon,

 valve & compression meter and safety index

 of safety valve & compression meter and

 block barrier in the welding gun before used.

 5、焊接前检查配电箱漏电开关是否正常,电焊

 机试运转,待运转正常后方可投入使用。

 Check all the leakage switch in the distribution

 box, welding machine shall run prior to

 commence to weld.

 6、焊接作业前,要检查作业现场是否有易燃易

 爆品,如有应处理完毕后方可使作业。 Deal

 with all explosive &flammables at word yard

 prior to weld.

 7、作业完毕后要把焊条、 电焊头及时清理干净。

 焊条必须专门回收。

 Cleaning all the welding

 rod immediately after work completing. And

 the welding rod should be recycled.

 Page 9 of 9

推荐访问:季度安全风险评估 风险评估 电气焊
上一篇:(地理德育渗透计划
下一篇:江西省河道采砂申请书-九江市河道采砂管理局,采砂管理局

Copyright @ 2013 - 2018 优秀啊教育网 All Rights Reserved

优秀啊教育网 版权所有