  公安交通指挥系统设计规范 第 2 部分:省(自治区)公安交通指挥系统

 Specifications for the design of public security traffic command system — Part 2: Public security traffic command system for provinces and autonomous regions GA/T 515.2—20×× 代替 GA/T 515.2-2011

 GA/T 515.2—20××

 I 目 录

  前 言 ················································································································· V 1

 范围 ·························································································································· 1 2 规范性引用文件 ·········································································································· 1 3 术语和定义 ················································································································· 1 3.1

 集成应用平台

 INTEGRATED APPLICATION PLATFORM

 ··························································· 1 3.2

 应用支撑系统

 APPLICATION SUPPORT SYSTEM

 ·································································· 2 3.3

 运行保障系统

 OPERATION SUPPORT SYSTEM

 ····································································· 2 3.4

 基础配套设施

 SUPPORTING FUNDAMENTAL FACILITY

 ·························································· 2 4 设计要求 ···················································································································· 2 4.1

 设计流程 ··············································································································· 2 4.2

 编制设计任务书 ······································································································ 2 4.3

 调查 ····················································································································· 2 4.3.1 省(自治区)基本情况 ······················································································· 2 4.3.2 省(自治区)交通情况 ······················································································· 2 4.3.2.1 道路情况 ···································································································· 2 4.3.2.2 道路交通安全情况 ························································································ 3 4.3.2.3 道路交通运行状态情况 ·················································································· 3 4.3.2.4 公安交通管理体制情况 ·················································································· 3 4.3.2.5 公安交通管理机制情况 ·················································································· 3 4.3.3 省(自治区)公路交通管理措施情况 ····································································· 3 4.3.4 省(自治区)交通管理科技建设情况 ····································································· 3 4.3.4.1 省(自治区)公安交通管理科技建设情况 ························································· 3 4.3.4.2 设区市(地区、州、盟)公安交通管理科技建设情况 ·········································· 4 4.3.4.3 公安其他部门科技建设应用情况 ······································································ 4 4.3.4.4 相关单位科技建设情况 ·················································································· 4 4.4

 现场勘察 ··············································································································· 4 4.5

 调研报告 ··············································································································· 5 4.6

 初步设计 ··············································································································· 5 4.6.1 初步设计依据 ··································································································· 5 4.6.2 初步设计文件 ··································································································· 5 4.6.2.1 初步设计技术方案 ························································································ 5 4.6.2.2 初步设计图纸 ······························································································ 5 4.6.2.2.1 图纸组成 ······························································································ 5 4.6.2.2.2 图纸要求 ······························································································ 6 4.6.2.3 主要设备和材料设计要求 ··············································································· 6 4.6.2.4 初步设计概算 ······························································································ 6 4.6.3 初步设计评审 ··································································································· 6 4.7

 施工图设计 ············································································································ 6

 GA/T 515.2—20××

 II 4.7.1 施工图设计依据 ································································································ 6 4.7.2 施工图设计文件 ································································································ 6 4.7.2.1 施工设计技术方案 ························································································ 6 4.7.2.2 施工图设计图纸 ··························································································· 7 4.7.2.3 设备和材料设计要求 ····················································································· 7 4.7.2.4 施工图预算 ································································································· 7 附 录 A (规范性附录)

 初步设计技术方案要求 ································································ 8 A.1

 概述 ···················································································································· 8 A.2

 现状调查与分析 ····································································································· 8 A.3

 需求分析 ·············································································································· 8 A.4

 设计依据 ·············································································································· 8 A.5

 总体设计 ·············································································································· 8 A.5.1 设计原则 ········································································································ 8 A.5.2 建设目标 ········································································································ 8 A.5.2.1 总体目标 ··································································································· 8 A.5.2.2 具体目标 ··································································································· 8 A.5.3 建设内容 ········································································································ 8 A.5.4 总体结构 ········································································································ 8 A.5.5 系统指标 ········································································································ 9 A.6

 集成应用平台设计 ·································································································· 9 A.6.1 平台结构 ········································································································ 9 A.6.2 平台功能 ········································································································ 9 A.6.3 平台关联 ········································································································ 9 A.6.4 软硬件配置设计 ······························································································· 9 A.6.4.1 服务器设备 ································································································ 9 A.6.4.2 存储设备 ··································································································· 9 A.6.4.3 网络设备 ································································································· 10 A.7

 应用支撑系统设计 ································································································ 10 A.7.1 交通管理数据资源管理系统 ·············································································· 10 A.7.1.1 系统结构 ································································································· 10 A.7.1.2 系统功能 ································································································· 10 A.7.1.3 系统关联 ································································································· 10 A.7.1.3.1 关联数据 ···························································································· 10 A.7.1.3.2 关联接口 ···························································································· 10 A.7.2 交通管理地理信息系统 ···················································································· 11 A.7.2.1 系统结构 ································································································· 11 A.7.2.2 系统功能 ································································································· 11 A.7.3 交通视频监视联网系统 ···················································································· 11 A.7.3.1 系统结构 ································································································· 11 A.7.3.2 系统功能 ································································································· 11 A.7.4 软硬件配置设计 ····························································································· 12 A.8

 运行保障系统设计 ································································································ 12 A.8.1 通信系统 ······································································································ 12

 GA/T 515.2—20××

 III A.8.1.1 网络拓扑 ································································································· 12 A.8.1.1.1 基本要求 ···························································································· 12 A.8.1.1.2 指挥中心与设区市(地区、州、盟)指挥中心的信息传输 ···························· 12 A.8.1.1.3 指挥中心内部的信息传输 ······································································· 12 A.8.1.2 路由和设备 ······························································································ 12 A.8.1.3 方式 ······································································································· 12 A.8.1.4 介质 ······································································································· 13 A.8.1.4.1 光缆 ·································································································· 13 A.8.1.4.2 控制电缆、视频电缆 ············································································· 13 A.8.1.5 设备选型 ································································································· 13 A.8.1.5.1 光纤端设备设计 ··················································································· 13 A.8.1.5.2 专用无线、公用无线传输设备设计 ··························································· 13 A.8.2 信息安全防护系统 ·························································································· 13 A.8.2.1 系统安全等级保护 ····················································································· 13 A.8.2.2 网络安全 ································································································· 13 A.8.2.2.1 公安交通指挥系统专网 ·········································································· 13 A.8.2.2.2 公安信息通信网 ··················································································· 14 A.8.2.2.3 互联网 ······························································································· 14 A.8.2.3 应用安全 ································································································· 14 A.8.2.4 配套管理 ································································································· 14 A.8.3 运行维护管理系统 ·························································································· 14 A.8.3.1 系统结构 ································································································· 14 A.8.3.2 系统功能 ································································································· 14 A.8.4 软硬件配置设计 ····························································································· 15 A.9

 基础配套设施设计 ································································································ 15 A.9.1 指挥中心大厅 ································································································ 15 A.9.2 会议决策室 ··································································································· 15 A.9.3 备勤室 ········································································································· 15 A.9.4 显示系统 ······································································································ 15 A.9.5 视频会议系统 ································································································ 15 A.9.6 机房 ············································································································ 16 A.9.7 空调系统 ······································································································ 16 A.9.8 新风系统 ······································································································ 16 A.9.9 门禁系统 ······································································································ 16 A.9.10 消防系统 ····································································································· 16 A.9.11 照明 ··········································································································· 16 A.9.12 综合布线 ····································································································· 17 A.9.13 装饰装修 ····································································································· 17 A.9.14 供配电设计 ·································································································· 17 A.9.14.1 供配电方式 ···························································································· 17 A.9.14.2 容量 ······································································································ 17 A.9.14.3 电源质量································································································ 17 A.9.14.4 不间断电源 ···························································································· 17

 GA/T 515.2—20××

 IV A.9.14.5 配电箱 ··································································································· 18 A.9.15 防雷与接地 ······························································································· 18 A.10

 建设与运行管理 ·································································································· 18 A.11

 人员配置与培训 ·································································································· 18 A.12

 工程实施进度 ····································································································· 18 A.13

 设计概算 ··········································································································· 18 参 考 文 献 ············································································································· 19

 GA/T 515.2—20××

 V 前 言

  GA/T 515《公安交通指挥系统设计规范》分为以下部分:

 ——第 1 部分:总则; ——第 2 部分:省(自治区)公安交通指挥系统; ——第 3 部分:城市公安交通指挥系统; ——第 4 部分:制图; „„ 本部分为GA/T 515的第2部分。

 本部分按照GB/T 1.1-2009给出的规则起草。

 本部分代替GA/T 515.2-2011《公安交通指挥系统设计规范 第2部分:省(自治区)公安交通指挥系统》。与GA/T 515.2-2011相比,除编辑性修改外主要技术变化如下:

 ——修改了“范围”(见第1章,2011年版的第1章); ——修改了“规范性引用文件”(见第2章,2011年版的第2章); ——修改了“术语和定义”(见第3章,2011年版的第3章); ——增加了“集成应用平台”的术语(见3.1); ——增加了“应用支撑系统”的术语(见3.2); ——增加了“运行保障系统”的术语(见3.3); ——增加了“基础配套设施”的术语(见3.4); ——修改了“编制设计任务书”(见4.2,2011年版的4.2); ——修改了“省(自治区)基本情况”的调查要求(见4.3.1,2011年版的4.3.1); ——修改了“道路情况”的调查要求(见4.3.2.1,2011年版的4.3.2.1); ——增加了“道路交通安全情况”的调查要求(见4.3.2.2); ——增加了“道路交通运行状态情况”的调查要求(见4.3.2.3); ——修改了“公安交通管理体制情况”的调查要求(见4.3.2.4,2011年版的4.3.2.2); ——增加了“公安交通管理机制情况”的调查要求(见4.3.2.5); ——修改了“省(自治区)公路交通管理措施情况”的调查要求(见4.3.3,2011年版的4.3.3); ——修改了“省(自治区)公安交通管理科技建设情况”的调查要求(见4.3.4.1,2011年版的4.3.4.1); ——增加了“设区市(地区、州、盟)公安交通管理科技建设情况”的调查要求(见4.3.4.2); ——增加了“公安其他部门科技建设情况”的调查要求(见4.3.4.3); ——增加了“相关单位科技建设情况”的调查要求(见4.3.4.4); ——修改了“建设场地现场勘察”的要求(见4.4,2011年版的4.4); ——删除了“勘察指挥中心情况”、“前端现场勘察”、“现场勘察报告”的要求(见2011年版的4.4.1、4.4.2、4.4.3); ——增加了“调研报告”的要求(见4.5); ——修改了“初步设计依据”的内容(见4.6.1,2011年版的4.5.1); ——修改了“初步设计技术方案”的要求(见4.6.2.1,2011年版的4.5.2.1); ——修改了“初步设计图纸组成”的要求(见4.6.2.2.1,2011年版的4.5.2.2.1); ——修改了“初步设计概算”的内容(见4.6.2.4,2011年版的4.5.2.4);

 GA/T 515.2—20××

 VI ——修改了“初步设计评审”的要求(见4.6.3,2011年版的4.5.3); ——修改了“施工图设计依据”的要求(见4.7.1,2011年版的4.6.1); ——修改了“施工设计技术方案”的要求(见4.7.2.1,2011年版的4.6.2.1); ——修改了“施工图设计图纸”的要求(见4.7.2.2,2011年版的4.6.2.2); ——修改了“设备和材料设计要求”的内容(见4.7.2.3,2011年版的4.6.2.3); ——增加了“施工图预算”的内容(见4.7.2.4); ——修改了附录A(见附录A,2011年版的附录A)。

 本部分由全国道路交通管理标准化技术委员会(SAC/TC 576)提出并归口。

 本部分负责起草单位:××。

 本部分参加起草单位:××。

 本部分主要起草人:××。

 本部分所代替标准的历次版本发布情况为:

 ——GA/T 515.2–2011。

 GA/T 515.2—20×× 第 1 页

 共 19 页 公安交通指挥系统设计规范 第 2 部分:省(自治区)公安交通指挥系统

 1

 范围 GA/T 515 的本部分规定了省(自治区)公安交通指挥系统的设计要求及初步设计技术方案要求。

 本部分适用于省(自治区)公安交通指挥系统的设计。

 2 规范性引用文件 下列文件对于本文件的应用是必不可少的。凡是注日期的引用文件,仅注日期的版本适用于本文件。凡是不注日期的引用文件,其最新版本(包括所有的修改单)适用于本文件。

 GB/T 2887

 计算机场地通用规范 GB/T 22239

 信息安全技术 信息系统安全等级保护基本要求 GB/T 28181

 公共安全视频监控联网系统信息传输、交换、控制技术要求 GB 50034

 建筑照明设计标准 GB 50174

 数据中心设计规范 GB 50217

 电力工程电缆设计规范 GB 50311

 综合布线系统工程设计规范 GB 50343

 建筑物电子信息系统防雷技术规范 GB 50370

 气体灭火系统设计规范 GB 50395

 视频安防监控系统工程设计规范 GB 50396

 出入口控制系统工程设计规范 GB 50736

 民用建筑供暖通风与空气调节设计规范 GB 50898

 细水雾灭火系统技术规范 GA/T 515.1

 公安交通指挥系统设计规范 第 1 部分:总则 GA/T 515.4

 公安交通指挥系统设计规范 第 4 部分:制图 GA/T 1049(所有部分)

 公安交通集成指挥平台通信协议 GA/T 1389

 信息安全技术 网络安全等级保护定级指南 YD/T 5024

 SDH 本地网光缆传输工程设计规范 YD 5102

 通信线路工程设计规范 YD 5137

 本地通信线路工程设计规范 3 术语和定义 GA/T 515.1 界定的以及下列术语和定义适用于本文件。

 3.1 集成应用平台 integrated application platform 集道路交通监测、决策、控制和服务为一体的应用软件系统。

 GA/T 515.2—20×× 第 2 页

 共 19 页 3.2 应用支撑系统 application support system 为智能交通管理系统集成应用平台提供数据存储管理、数据计算、数据交互以及地图服务等能力的支撑系统。

 注:应用支撑系统主要包括交通管理数据资源管理系统、交通管理地理信息系统等。

 3.3 运行保障系统 operation support system 为智能交通管理系统提供通信、系统安全以及运行维护管理等功能的系统。

 注:运行保障系统主要包括通信系统、信息安全防护系统、运行维护管理系统等。

 3.4 基础配套设施 supporting fundamental facility 满足智能交通管理系统建设及应用的基础运行环境。

 注:基础配套设施主要包括指挥中心基础配套设施、分指挥中心基础配套设施、前端基础配套设施等。

 4 设计要求 4.1 设计流程 设计流程应符合 GA/T 515.1 要求。

 4.2 编制设计任务书 建设单位根据已批复的项目建议...