精美个人简历范文2-英文

来源:三年级 发布时间:2020-08-22 点击:

 YunRi,ing Function Project Management Electrical & Sales Engineer PERSONAL RESUME

  RESUME

 Start with every little detail Name:YunRi, ing Se:Male Telephone:133-333-33333 E-mail:1333333333@163 Huou/Nation:Hainan Address:Shanghai-Pudong Marital Status:Married Age:35 Years old (1981.04.07)

 Wor:15 Years School:Beni Liaoning Metallurgy College Major:Power supply and distribution technology Degree:Associate Basic Info Job Preferences Target Salary ¥10,000-14,999 Month

 Location Haiou Duty Time within 3 month

 Job Type Full-time Function Project Management Electrical & Mechanical Engineer Sales Engineer Education 1999.09-2002.07

 Beni Liaoning Metallurgy College

 Associate :Power supply and distribution technology Major course:Through the circuit principle, PLC principle and application, the principle of automatic control, motor and drag foundation, relay protection, power plant and other learning Description:I formed a strong ability of engineering practice, the potential for sustainable development of engineering application talents. 2014.10-2016.09

  DeCai Education Schoo

  Registered architect training Location Shanghai Description:Through training, master the process of mechanical and electrical engineering project management, familiar with the laws and regulations of mechanical and electrical engineering, to understand the ey points in the electrical and Mechanical Practice of ey node control. Wor Eperience 2007.12- Present

 Distribution Products Division

  FAE Senior Engineer Delta Group DeltaGreen Limited Company (9 year and 1month)

 Instrument/Industry Automation|5000-10000 people|Foreign Comp.(Others) Description:

  Responsible for the business cost control of the project bidding.  responsible for communicating with Client"s technology team during the whole phase of project.  Be responsible for communication and coordination with contractor about cost increase , decrease and claim.  Be responsible for checing whether the products are in line qualified for the technical requirements.  Positively cooperation with client"s audit of factory. 2005.05-2007.05

 R&D Dept

  Design of high and low voltage power distribution cabinet Sheng Ying electric (unshan) Co., Ltd. (2 year)

 Instrument/Industry Automation|150-500 people|Foreign Comp.(Others) Description:

  Responsible for the one or two line and structure design of high and low voltage distribution. 2002.10-2005.05

 Quality Dept

  Automotive Quality Management| Sheng Ying electric (unshan) Co., Ltd. (2 year and 7month)

 Instrument/Industry Automation|150-500 people|Foreign Comp.(Others)

 Sills & Speciality  The English ability good spoen and written ability, can communicate in simple english.  Teaching Qualifiacation Certificate (Good) have the necessary nowledge and sills of electrical engineers.  Registered Architect (Qualified) have the solid construction of nowledge, rich eperience. Description:

  Responsible for inspection and commissioning of high and low voltage distribution.  Responsible for joint test with

 the factory of client.  Be responsible for checing the machine before power on during onsite test. Project Eperience 2015.11-2016.03

  Shani Unicom (Taiyuan, Jincheng, Changhi Jicai) Related Company:

 Delta Group DeltaGreen Limited Company Description:

  This project is owned to

 Shani province Unicom"s Centralied purchasing

  Unicom IDC room level distribution of major areas of Taiyuan, and Jincheng . The project has won 88 ABB MNS2.0 low voltage distribution. participated in the early scene investigation in the project. and participated in the discussion of maing the whole solution

 of the project according to the eploration.Based the project solution,budget the cost of project. Responsibility:

  responsible for the business cost of the project bidding phase.  responsible for the project production stage and wor delivery of Design Institute.

  responsible for the audit of factory production products to meet the technical requirements of the agreement.  responsible for controlling the project cost in the budget. 2014.09-2015.01

 Northwest International Airport command Gallery Related Company:Delta Group DeltaGreen Limited Company Description:

  This project is the new requirement of

 high and low voltage distribution of second phase of the i"an international airport including 10 sets of 10V YN28-12

 ,48 sets of Schneider brand cabinet BLOSET, and 120 sets of the onsite illuminated panel

 . Responsibility:

  responsible for the business cost of the project bidding phase.  responsible for the project production stage and wor delivery of Design Institute.

  responsible for the audit of factory production products to meet the technical requirements of the agreement.  responsible for controlling the project cost in the budget. 2004.03-2004.05

  Ningbo Li Yang chemical fiber Related Company:Delta Group DeltaGreen Limited Company Description:

  This project"s client is an enterprise that produces acrylic cotton fiber chemicals ,invested by Japan"s MITSUBISHI.The solution

 high voltage 10V uses single busbar system, a total of 24 units and 4 sets of high voltage capacitor compensation cabinet.  This project uses the ABB REF541 to prepare for self cast, SPAJ160C does capacitor protection. Responsibility:

  responsible for the inspection and commissioning of high voltage system.  responsible for the logic editing wor  responsible for the client"s inspection.  responsible for the on-site coordination with the power supply bureau before the commissioning test.

 looing forward to your reply

推荐访问:英文 个人简历 精美
上一篇:个人述职报告,7
下一篇:精美个人简历范文7-英文

Copyright @ 2013 - 2018 优秀啊教育网 All Rights Reserved

优秀啊教育网 版权所有